PRODUCTS

Four product lines across the full evaluation chain

Edge AI inference and on-board computing for all hardware products are deployed on the NVIDIA Jetson platform. R-Eval is live; R-Box and R-ORV have completed prototype validation.

R-ORV · OFF-ROAD TEST CARRIER

A test carrier built to be crashed

Existing research platforms: ≤10 km/h, flat indoor floors, single-robot, ¥75–150K per unit — lab assets too precious to crash. The R-ORV inverts every parameter: 304×215 mm footprint, 60 km/h top speed, ≤¥30K per unit, expendable — designed for adversarial testing, fault injection, and multi-vehicle scenarios.

Dimensions304 × 215 mm
Top speed60 km/h straight-line (field-tested, 2026)
Track average35 km/h (unpaved track, measured)
Unit cost≤ ¥30K
ConfigurationHigh-torque Ackermann-steering 4WD off-road chassis, R-Box mountable
Edge computingNVIDIA Jetson platform for motion-state sensing and power-distribution control
StatusPrototype validation complete; batch consistency subject to 60-unit small-batch run
R-ORV vehicle rendering
R-ORV · design rendering
R-ORV chassis with compute hardware
R-ORV chassis: Jetson compute, sensors and wiring (prototype photo)

Brand film: real R-ORV field footage + concept (CG) adversarial competition scenes, 92 seconds.

R-BOX · MEASUREMENT UNIT

Measurement is evidence

Self-designed vehicle-mounted measurement hardware, with edge capture and preprocessing on the NVIDIA Jetson platform. Five prototypes built and vehicle-validated, with 17+ dimensions of stable capture — capture and evidence retention happen in one step.

17+ dimensions

IMU, vision, CAN bus, coordination link, fault events — multi-source data unified into one store.

IMU · VISION · CAN · LINK · FAULTS

Unified time base

Time synchronization maintained under GNSS-denied conditions — an engineering barrier, not an algorithmic one.

UNIFIED TIME BASE

Fault injection

Standardized fault scenarios: designed, reproducible, replayable — feeding the RRI / CRI metrics.

FAULT INJECTION

Tamper-evident capture

Capture is evidence: evaluation reports become auditable and re-checkable.

TAMPER-EVIDENT
Prototype5 units built, vehicle capture chain running
ProductionDelivery starts after 60-unit small-batch validation (in progress)
R-EVAL · EVALUATION PLATFORM

Intelligent evaluation, traceable judgment

Self-designed evaluation software, delivered as SaaS or on-premise, live and running. The pipeline runs end to end: R-Box capture → temporal alignment → event segmentation → metric output. Conclusions are reproducible, auditable, and traceable.

Live demo → Request access

Demo requires a Kimi account sign-in; the workspace includes a public competition dashboard.

PIPELINE

From capture to conclusion in four steps

01R-Box capture

17+ dimensions captured on a unified time base, tamper-evident

→
02Temporal alignment

Multi-source, heterogeneous data aligned onto one time base

→
03Event segmentation

Automatic slicing by fault event and task phase — faster attribution

→
04Metric output

RRI / CRI quantified scoring — reproducible, auditable conclusions

MODULES

One platform, three views

Evaluation workspace

Import R-Box capture data, run temporal alignment, event segmentation, and metric computation. Projects organized by competition and task, with results archived and traceable.

WORKSPACE

Traceable judgment

Every judgment maps back to raw data segments and timestamps: scores can be replayed and reviewed, disputes arbitrated — same logic for competition judging and delivery acceptance.

TRACEABLE JUDGMENT

Public dashboard

During competitions: rankings, task completion, and key-event timelines displayed publicly — visible evaluation becomes shareable material.

PUBLIC DASHBOARD
LIVE UI

The system is running — the interface is the proof

Actual screenshots from the R-Eval adjudication system: the two core views, overview and scoring.

R-Eval overview dashboard
Overview: live leader, valid telemetry samples, data quality and event segments (demo competition data, not real samples)
R-Eval scoring and adjudication
Scoring & adjudication: RRI / CRI worksheets, team ranking and final ruling lock (demo competition data, not real samples)
METRICS

RRI / CRI: reliability without adjectives

RRI · Robot Reliability Index

Quantified scoring of single-robot reliability in defined scenarios, driven by fault-injection results and task-process data. Same vehicle, new data, the score speaks.

ROBOT RELIABILITY INDEX

CRI · Coordination Reliability Index

For multi-vehicle coordination: formation keeping, task-allocation success rate, and link stability quantified in one index — coordination becomes horizontally comparable.

COORDINATION RELIABILITY INDEX
DEPLOYMENT

Two delivery options, status stated as-is

DeliverySaaS subscription / on-premise (data stays on-site)
StatusLive; pipeline running end to end
Data inputR-Box capture (standard-format import supported)
Live demo6qkj2rguottqe.kimi.site (Kimi account required)
EXTENDED

R-SIM simulation platform · dual-vehicle university research kit

R-SIM simulation platform (planned)

A simulation environment closed-looped with R-Box / R-Eval field data: real fault data feeds back to refine the model, narrowing the sim-to-real gap. Beta in Q4 2027.

PLANNED · BETA Q4 2027

Dual-vehicle coordination research kit

For university labs: two carriers + R-Box measurement + R-Eval teaching edition + course experiments — an out-of-the-box multi-agent research platform.

UNIVERSITY RESEARCH KIT

View R&D →